Follow-up grading: severity and priority
A follow-up can carry two grades, set together with the day they were confirmed. Anything that lists follow-ups to pick the next piece of work, such as the context index’s readers, a session-start summary or the follow-up skill, can sort by them. Grades apply to follow-ups only.
The fields
severity: HIGH
priority: P2
graded: 2026-10-07
severityis what is at risk if the follow-up is never done.priorityis how soon it should be picked up.gradedis the day the user confirmed the two grades. It is never filled in automatically.
The three lines go at the end of the frontmatter, just before the closing ---, in the order severity, priority, graded. That keeps them away from the status: line that other sessions edit when they close a follow-up. They are set together: a follow-up has both grades and a graded date, or none. A follow-up with none of them is ungraded. One with only one grade, no graded date, or a value not listed below is invalid, and readers show it as written with a ?. Readers match values case-insensitively.
Severity: what is at risk if it is never done
| Value | Decision test |
|---|---|
CRITICAL |
Never doing it leaves a regulated system, participant data, a security exposure or a broken gate open. |
HIGH |
Never doing it leaves a real defect, a misleading result or a blocked workflow in place. People work around it, but the workaround costs them. |
MEDIUM |
Never doing it leaves friction or drift: slower work, a stale document, a tool that misleads now and then. |
LOW |
Never doing it changes little: a tidy-up, a nice-to-have, a note for later. |
Severity is the follow-up’s own risk. It is not inherited from its plan’s value: a follow-up of a HIGH-value plan can be LOW.
Priority: how soon it should be picked up
| Value | Decision test |
|---|---|
P1 |
It should be picked up this week, or it blocks other work now. |
P2 |
It should be picked up within about a month, or before the work it relates to next moves. |
P3 |
It can wait until someone is working in that area anyway. |
A follow-up with an open blocked-by is not P1, because it cannot be started.
Who sets a grade
- The agent proposes
severityandpriority, with a one-line reason, when it files a follow-up or during a grading batch. - The user confirms or changes them, or leaves the follow-up ungraded.
- Only then are the three lines written, with
gradedset to that day. With the generator, that means passing--severity,--priorityand--gradedonly after the user has confirmed.
Where the project has a guardrail that asks the user before any grade line is written or changed, it enforces step 2. Where it has none, this rule is the only check. A grade written without the user’s confirmation is a defect to revert, not a judgement to keep.
A file that already has a graded line is never re-proposed for grading unless the user asks, even if a reader shows no grade for it. Readers that take grades from the context index show none until the index has been regenerated with an indexer that carries them.
Changing or closing
- To regrade, the user says so and the agent rewrites the three lines with a new
gradeddate. - Closing a follow-up leaves its grades in place. Readers ignore grades on closed follow-ups.
Sort order
Graded follow-ups come first, by severity (CRITICAL before HIGH, MEDIUM, LOW), then priority (P1 before P2, P3), then newest date, then path. The ones needing a grade, ungraded or invalid, follow, newest first, and are counted.